Sadler Solar is a 100 MW solar site in Emporia, Virginia. We partnered with Dominion Energy, who contracted with Brad Cole Construction, to go out and hand the erosion control, soil stabilization, and grassing for the majority of the site. This site specifically had over 50 retention ponds that had to be stabilized, along with around 1000 acres of flat grassing and hydroseeding.