Decatur Parkway Solar, in Bainbridge, Ga was a contract we had with Brad Cole Construction. We assisted them with this emergency job where the original civil contractor was removed from the site after GEPD had put a stop work on the site. With a 45 day timeline, we assisted Brad Cole with erosion control and soil stabilization techniques to actually finish the project in 23 days, instead of the full 45. 27,000LF of silt fence, plus hydroseeding to stabilize the detentions ponds, and flat grassing to stabilize the flat ground around the site, specifically around and under the solar panels. Soil testing was done to find the optimum means of bring the soil to the best quality to have proper, long lasting growth, with specific species of grasses that actually benefit the local ecology and wildlife chosen.